A road surface covering system includes a road surface covering of concrete or asphalt, water-permeable tiles disposed adjacent to an outer edge of the road surface covering and having a water conductivity of at least 7 inches of water per hour, and a subgrade bed of fill material including porous sand. The porous sand includes at least 70 % of naturally occurring micaceous arkose rock material having at least 30 wt % of mica, and at least 50 vol % of the micaceous arkose rock material having a mean diameter of between 0.060 mm and 0.65 mm. The micaceous arkose rock material being previously kilned at a temperature of between 1100 ° C. and 1300 ° C.
AquiPor Community, Did you see the recent investigative article in the New York Times regarding groundwater depletion in the U.S.? Aquifers supply […]
The U.S. Geological Survey recently put together a model that estimated the amount of impervious parking lot coverage in the United States. […]
At AquiPor, we believe that climate change is mostly a water issue. One of the most significant impacts of a warming atmosphere […]
Copyright © 2023 AquiPor Technologies. Site designed & developed by Houdini Interactive.